6-Lane Greenfield highway from Sangariya – Rasisar (near Bikaner) Section of NH-75K

The construction of a six-lane access-controlled Greenfield highway from km 200,000 to km 225,000 along the Sangariya-Rasisar section of NH-75K in Rajasthan is underway. This project is part of the Amritsar-Jamnagar Economic Corridor and the Bharatmala Pariyojana (Phase I), with the acronym AJ/SR-Package-8.

This new highway features six lanes to increase capacity and improve transportation efficiency in the region. The access-controlled design limits entry and exit points, reducing congestion and improving traffic flow. The project executed through Engineering, Procurement, and Construction mode, with the contractor responsible for design, procurement, construction, and commissioning.

The Bharatmala Pariyojana is an initiative by the Indian government to upgrade the national highway network and the Amritsar-Jamnagar Economic Corridor is a crucial aspect of it. This project will enhance road connectivity and promote economic growth in the area.

Overall, the construction of the six-lane access-controlled Greenfield highway provides a faster and safer journey for travelers and boost economic activity in the region. It is a key infrastructure project that will improve transportation in Rajasthan.

 

Name of the Project Construction of 6-Lane access controlled Greenfield highway from Km 200+000 to km 225+000 of Sangariya Chautala-Rasisar (near Bikaner) Section of NH-75K as a part of Amritsar-Jamnagar Economic Corridor in the state of rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-8)
Name of the Client National Highways Authority of India
Work Executed By VRC Constructions (India) Private Limited
Location Rajasthan
Construction Cost (in INR) 471.56 Crore
Segment Civil Construction
Sector Public
Construction Start Date 23.10.2020
Construction Completion Date 30.05.2022
Latest Status Completed