It gives us immense pleasure to inform that VRC Constructions have completed the projects within the stipulated time and handed over to respective Clients. The Client has appreciated our works at numerous occasions for successful execution of the Project by maintaining the Zero accident and fatalities.

Completed Projects
S. No. Details of the Works Client Value of Work (Rs. In Crore) Start Date Completion Date
1 Construction of 6-Lane access controlled Greenfield highway from Km 220+000 to km 225+000 of Sangariya (near Chautala-Rasisar (near Bikaner) Section of NH-75K as a part of Amritsar-Jamnagar Economic Corridor in the state of rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-8) National Highways Autority of India 471.56 23.10.2020 30.05.2022
2 Construction of 6-Lane access controlled Greenfield highway from Km 90+000 to km 120+000 of Rasisar (near Bikaner)-Depgarh (near Dhandhaniya) Section of NH-75K as a part of Amritsar-Jamnagar Economic Corridor in the state of rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RD-Package-4) National Highways Autority of India 432.47 06.12.2019 11.10.2021
3 Construction of 6-lane access controlled Greenfield highway from km 21+000 to km 48+000 of Deogarh (near Dhandhaniya) to Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridorin the State of Rajasthan under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-2) National Highways Autority of India 371.75 12.02.2020 10.11.2021
4 Development to Four Lane with paved shoulders of Tallewal-Barnala Section of NH-71 (New NH-703) from existing km. 114.000 to 136.070 including construction of Barnala bypass from existing km 136.070 of NH-71 to existing Km. 149.000 of NH-64 in the State of Punjab under NHDP-IV on EPC mode Ministry of Road Transport & Highways 325.83 14.09.2016 31.03.2019
5 EPCC-18B Package for Raw Water Reservoir at Township for Rajasthan Refinery Project of M/s HPCL Rajasthan Refinery Ltd. (HRRL) HRRL/EIL 251.87 20.12.2019 30.11.2022
6 Civil, Structural & U/G Piping works for LLDP/HDPE unit for Guru Gobind Singh Polymer Addition Project at Guru Gobind Singh Refinery of M/s HPCL-Mittal Energy Limited at Bathinda (Punjab) (BIDDING DOCUMENT NO RJ/B018-931-CI-TN-8110/1027 PART-A) HPCL-Mittal Energy Limited 232.00 17.01.2018 16.02.2021
7 Construction of C&D Block, Extended basement, MLCP block at Rajiv Gandhi Cancer Institute & Research Centre, Sector-5, Rohini, Delhi Rajiv Gandhi Cancer Institute & Research Centre. (A Unit of Indraprastha Cancer Society) 197.00 28.03.2015 31.08.2019
8 Construction of Krrish Florence Estate Housing at Gurgaon (RCC structure and other civil works) M/s Angle Infrastructure Pvt. Ltd 128.00 03.01.2013 31.12.2020
9 "Piling, Civil, Structural And U/G Piping Work For New Process Units At Panipat Refinery For BS-VI Project of Indian Oil Corporation Limited (IOCL), India" Indian Oil Corporation Limited, Panipat Refinery, 106.82 31.05.2017 20.03.2020
10 Contract CC·67 , Construction of Staff Quarters at Vinod Nagar Depot of PHASE·III OF DELHI MRTS Project Delhi metro Rail Corporation Ltd. 103.24 02.02.2015 15.02.2018
11 Main Civil Works for DHDT & HGU Project -HBDH_6403 for Rajasthan Refinery Project of M/s HPCL Rajasthan Refinery Ltd. (HRRL) TOYO/EIL/HRRL 99.13 03.02.2020 31.10.2022
12 Civil & Structural Work for High Density Polyethylene Unit, HMEL, Bathinda, Punjab Tecnimont Pvt Ltd 97.34 11.02.2019 12.10.2021
13 BHEL Civil, structural & architectural work etc. for RRVUNL, 2x660 MW, Stage-V Unit 7& 8 Suratgarh Super Critical TPS, Rajasthan Bharat Heavy Electrical Limited 98.96 22.09.2014 30.09.2018
14 Civil and Structural Works for Creating Infrastructure for 100KLPD of 2G Ethanol from Biomass at IOCL, Panipat Indian Oil Corporation Limited, Panipat Refinery, 98.88 25.11.2019 31.03.2022
15 "General Civil Works pertaining to HRRL-DFCU Project, Pachpadra- Barmer, Rajasthan." L&T / EIL 86.72 21.06.2021 31.10.2022
16 Rehabilitation and Development of Ghats and Crematoria along river Ganga Kanpur to Bithor National Mission for clean Ganga through Engineers India Ltd. 74.97 11.08.2016 28.07.2019
17 Construction of Residential Township Phase-II for HMEL HPCL-Mittal Energy Limited, INOX 70.61 18.04.2014 28.09.2015
18 Rehabilitation and Development of Ghats and Crematoria along river Ganga Balawali to Allahabad National Mission for clean Ganga through Engineers India Ltd. 62.97 15.06.2018 12.11.2020
19 Main Civil Work for GLMRF, Mundra Gujarat Toyo Engineering India Pvt. Ltd. 48.46 29.09.2014 29.03.2017
20 Supplementary Mecanical Works in DFCU Area for Guru Gobind Singh Polymer Addition Project , Bathinda M/s HPCL-Mittal Energy Limited 35.87 25.12.2020 24.03.2022
21 Micrograding Works at GGS Refinery site for Guru Gobind Singh Polymer Addition Project, Bathinda M/s HPCL-Mittal Energy Limited 19.07 19.11.2020 30.10.2022
22 Site Infrastructure work for NFC Kota Nuclear Fuel Complex (NFC), Kota 43.97 22.10.2015 17.06.2017
23 Civil and structural works for Licensor Units and Utilities & Off sites for Revamp and Capacity Enhancement Project at Bina Refinery of Bharat Oman Refineries Limited Bharat Oman Refineries Limited (BORL) 42.38 17.02.2017 31.07.2018
24 Civil & Structural Works, Piling and other allied works for Catalyst plant at IOCL Panipat Refinery Indian Oil Corporation Limited, Panipat Refinery, 39.74 11.01.2019 31.03.2022
25 Construction of Permanent campus for National Institute of Electronics and Information Technology (NIELIT) at Bihta, Patna National Buildings Construction Corporation Ltd. (NBCC) 33.78 23.06.2015 30.06.2018
26 Construction of Boundary Wall, Security Guard House and Site Development of NFC Township near Anutara Colony at Rawatbhata, Kota, Rajasthan Nuclear Fuel Complex (NFC), Kota 28.44 12.11.2019 31.03.2022
27 Precast Civil Works pertaining to DFCU Project, HRRL L& T Hydrocarbon Engineering Limited/ HPCL Rajasthan Refinery Ltd. (HRRL) 39 22.07.2021 30.09.2022
28 Precast Civil Works pertaining to PFCCU Project, HRRL L& T Hydrocarbon Engineering Limited/ HPCL Rajasthan Refinery Ltd. (HRRL) 8 22.07.2021 30.09.2022
29 6 -Laning of Mandi Dabwali (Punjab / Haryana border) – Chautala road section from Proposed Mandi Dabwali Bypass (Design Ch. 27.400) to Chautala (Design Ch. 62.200) of NH-54 under Bharatmala Pariyojna (designed length 34.800) in the State of Haryana under HAM NHAI - HAM 864.27 22.01.2022 21.01.2024
30 Storm Water Reservoir -1,2 & 3 – Civil, Structural Steel and other allied works for Construction of Storm Water Reservoir-1, 2 & 3 at NFC-K,Rawatbhata, Kota, Rajasthan NFC 68.38 27.10.2021 11.11.2023